| 1. Size of Power Plant | |
| Feasible Plant size as per your : | kW |
| 2. Cost of the Plant : | |
| MNRE current Benchmark Cost : | Rs. Rs. / kW |
| Without subsidy (Based on current MNRE benchmark) : | Rs. |
| With subsidy % (Based on current MNRE benchmark) : | Rs. |
| 3. Total Electricity Generation from Solar Plant : | |
| Annual : | kWh |
| Life-Time (25 years): | kWh |
| 4) Financial Savings : | |
| a) Tariff @ Rs. / kWh (for top slab of traffic) – No increase assumed over 25 years : | |
| Monthly : | Rs. |
| Annually : | Rs. |
| Life-Time (25 years) : | Rs. |